Home improvement to start from the slightest start

Renovation is a hassle. This has long been the consensus of many homeowners. Therefore, for those who are afraid of trouble and economic conditions are better, buying a fully-furnished house is a good choice. However, the purchase of a fully-furnished room does not mean that you absolutely rest assured that the necessary check and acceptance is necessary when purchasing or staying. As the renovation process has ended, the quality of the house decoration has no way of inspection, only from a few nuances to start, the following will introduce the relevant points for the acceptance of the whole room decoration. It is also a good reference for the owners who are renovating.

1, ready to work. The inspection of the house is a hard and complicated project. The preparatory work must be in place before the start of the inspection. The purchase contract must be available, and there are many attachments on the contract that are important for the acceptance of the furnishing room, such as the community map and the detailed rules.

2. The drawing of the room type with dimensions should be prepared before acceptance of the house, not only the floor plan of the house, but also the circuit and waterway drawings.

3, before the acceptance of the house to get a good key, the key number is more, there are floor keys, door keys, water meters, meter keys, be careful not to miss.

4. The decoration material confirmation sheet is also indispensable for acceptance. The above records the brand, style and model of the material, and it is necessary to check the acceptance of the fully furnished room.

5, acceptance structure. It was found that the structure of the fully-decorated room was inconsistent with the contract and must be submitted to the real estate developer prior to arrival. If the resistance was encountered, it could also be reported to the relevant government departments. If only the non-structural problems were found, the house could be hand-written when it was handed over to require real estate records. The company has written a commitment to perform maintenance within a certain time limit. The first step is to inspect the whole house after renovation, check the area, check the orientation of the location, measure the public area, and check whether some outdoor facilities are intact.

6. Checking the project is often overlooked by many owners and it is considered unlikely that there will be problems. In fact, many owners are surprised to find that the construction project has been missed.

7. The inspection room should pay attention to whether the materials used are consistent with those promised in the contract. Whether it is a well-known brand, whether the model style corresponds to it, and so on. If there is any mistake, it should be negotiated promptly.

8, a small high-rise after the renovation sometimes appears such a problem, the height of the developer's commitment is not in line with the height of the storey building before the renovation has been tense, high-level, after the decoration is more likely to become depressed.

9, whether the balcony can be closed after the owners generally need to pay attention to the problem after the house is purchased, the owner of the purchase of the decoration of the house must also be taken into account, if the future to be closed balcony may be some layouts still need to be changed.

10. Whether the bathroom exhaust hole has been left well is a link that should not be neglected in the acceptance. You can uncover the ceiling to check if the pipes are all in place.

11, some vacant structure we must not be ignored, in particular, pay attention to size, look at what can be done in the future, for example, this gap in the kitchen is not enough to put the refrigerator, it is embarrassing.

12, carefully check the drawings, to see whether the location of important facilities change, changes should be recorded in the case; the location of this box design should have been above the wall, the construction party has made changes, it is difficult to clarify the responsibility of the future without modifying the design.

13, first of all should be to check whether the drainage pipe open, open the tap water, see if there is leakage of water, and then take a look at the water pressure, observe the drainage rate is ideal.

14. Take a glass of water under the faucet and observe the presence of rust. If you think there is a problem with the quality of the water supply, you can ask the developer to provide the water quality inspection certificate issued by the epidemic prevention department.

15. Observe whether the position of the drainage pipe is reasonable and there are traces of water seepage around. Where water leakage occurs, it will usually leave marks on the surface of the wall. As long as you examine it carefully, you can find it.

16. The total power consumption of households is generally limited. “Two-way power supply, lighting, and power system shunt” are the most basic requirements. These should be reflected in the circuit layout of the distribution box.

17. Check the full-scale renovation room to do a power-off test. First, pull down the gate to see if the power supply is completely off; then close the gates separately to see if they fully control the branch lines.

18, to check whether the lamp, socket outlets in each house have electricity, telephone jacks, broadband jacks, TV antenna jacks, emergency socket position is accurate and smooth, the necessary can be tested in conjunction with the developer.

19. The outdoor unit of the air conditioner shall reserve a position on the outdoor side of the main halls. The air conditioner shall reserve pipeline holes, and the space surrounded by the air conditioners shall be reserved for air-conditioning pipeline passages.

20. Gas pipeline: Under normal circumstances, the gas pipeline should be taken out of the pipeline, so that once there is a gas leak can be found in time, easy to maintain, do not leave security risks, the inspection of the water, electricity, gas meter by the way when the degree is zero.

21. Acceptance of the construction quality of heaven, earth, wall, earth, and walls will be reflected directly from the various surfaces of the house, which will have a great influence on the beauty and function of the house. Acceptance of "days, grounds, and walls" will have many details that require attention. First of all, it is to detect whether the ground is flat or not. Professionals use a spirit level. Everyone can use a table tennis instead. Put the table tennis balls on the ground.

22. Pay attention to see if the corner line of the wall is straight, if the wall is flat, if there is a crack, if it is found that it must be clear whether it is a structural crack in the house, it is better to call the developer to check it.

23, to check whether there is empty drum under the wall, as long as the tap with a small hammer, you can hear there is no emptying below, if you do not carry a small hammer with a carry a dollar coin or small stick can also be.

24. The installation of the ceiling requires that the top corner line and the surrounding walls be tightly fitted. The degree of close connection between the buckle plates should be the same. There should not be large cracks and tilts. The ceiling should look smooth and smooth.

25, inspection of the floor depends on the overall cooperation, the foot should also be the same, the floor should not have arch deformation or serious color difference, when the test should pay attention to whether the floor to step on a sound.

26, further floor inspection paint film is smooth, whether the surface has bubbles, scratches; pay attention to check whether the water content of the floor meets the requirements, keel water content is also an important indicator, the keel should be done before laying the drying process.

27, wall tiles can be tapped with a hammer to hammer the wall, under 15% of the area under a wall tile hollow drum is also acceptable, and then use a pen to mark the above rework, tile paving principle is not allowed There is empty drum.

28, inspection fine decoration room is not just a look on it, but also learn to smell, benzene paint will make you feel a faint aroma in the room, some paint toluene diiso acid content is excessive, its steam is toxic, will stimulate eye.

29. Acceptance Doors, windows, ladder doors, windows, and ladders are key components of interior decoration. Unlike the display of heaven, earth, and walls, they mainly achieve beautiful decorative effects, and they themselves have very important practicalities. Functionality is essential for everyday life in peacetime. The acceptance of good doors, windows and ladders has very practical significance. Now to inspect the door, the inner side of the wooden door frame should have a smooth surface, usually requires every 2 meters of flatness should be less than 2 millimeters, poor paste or late protection will make this uneven.

30. Pay attention to verify whether the plywood of the door frame is parallel to the wall surface. It is very easy for ordinary people to ignore this point at the beginning, especially if the room is poorly lit, and it seems to be difficult to see from the side for a long time.

Links: Quick acceptance of kitchen and bathroom coup

Construction Acceptance House Renovation House Window Coatings Flooring Tiles Kitchen Wall Tiles Bathroom Doors Bathroom Ceiling Material Bathroom Wall Tiles Bathroom Dimensions Bathroom Floor Tiles Bathroom Ceilings Whole Bathroom Toilet Design Toilet Door Size Bathroom Leaking

New Design Door

ZHEJIANG HONGTUO INDUSTRIAL CO., LTD. , http://www.hongtuodoor.com