Autumn and winter decoration inspection key project

The acceptance of autumn and winter decoration is not very different from that of other seasons. Apart from choosing a formal decoration company for protection, water circuits, walls, ceilings, wood and wooden floors have become the key projects for acceptance, and they have been clearly defined in the “Residential Decoration Acceptance Criteria”. The regulations can be obtained from the decoration company. At the same time, the owner has mastered these tips and can make acceptance more prepared and easy to deal with.
Water supply and drainage pipeline acceptance
1. The arrangement of pipelines should meet the design requirements. The installation of pipelines should be fixed firmly without looseness. The faucet and valves should be installed smoothly, with flexible opening, smooth water flow, and normal operation of the water meter. Acceptance by visual inspection and feel.
2. There should be no leakage at the joints between pipelines and appliances, pipelines and pipelines. Using the method of passing water, visually and feel the method to check for leakage.
3, the installation of water pipes shall not be close to the power supply, and the spacing between the water pipes and gas pipes shall not be less than 50mm. Check with a steel tape measure.
Electrical acceptance
1. After the completion of the project, the owner shall provide the dimension drawing of the line going to the position and carry out the acceptance inspection one by one according to the above requirements. The concealed electrical line shall be concealed after the acceptance of the owner.
2. The position of the live wire and the neutral wire facing the power socket is the right flame left-zero, and the socket with the grounding hole should be the upper position of the ground wire socket, and the grounding should be reliable. The switch socket should be firmly installed. Visual inspection and manual methods are used to check and special tools for circuit testing are used to verify that the positions of the live, neutral and ground wires on the socket meet the requirements.
Tile mosaic acceptance
1. The wall-inlaid stickers should be firm, the surface is smooth and clean, and no leaks are posted wrongly; the gaps are evenly distributed around the periphery, and the brick surface has no cracks, falling angles, missing edges, etc., and can be accepted by visual inspection under natural light.
2, with a small hammer gently tap on the wall to see if there is emptying phenomenon.
Ceiling ceiling inspection installation should be solid, smooth surface, no pollution, cracks, missing edges, falling angle, hammer injury and other defects. Paste the fixed cover panel should not have delamination; cover panel should not have leakage, penetration, tilt angle and so on.
The position of the suspended ceiling should be accurate. All connecting pieces must be tightened and clamped firmly. The main keel has no obvious bending, and there is no obvious misalignment at the sub keel joint. The use of wooden ceilings, wooden keels should be fire-proof, in the installation of lamps and other objects in the location of fire prevention.
The shape, structure and installation position of the wood acceptance closet and hanging cabinet should meet the design requirements. The framework should use a hoe structure (except blockboard). The surface should be smooth, there should be no burrs and hammer marks, when using veneer material, it should be flat and firm, no degumming, no corners at the corners. Cabinet doors should be securely installed, with flexible switches, and parallel to the lower port and the lower port of the film. The hardware is fully installed, firm, and in the correct position. It is checked by visual inspection and feel.
Wooden floor inspection The surface of the wooden floor should be clean and free of stains, planed polished, no planer marks, planed burrs and burrs. The wooden grille should be firm, the spacing should meet the requirements, the laying should be firm, not loose, and the floor without noise when walking. Between the floor and the wall should be left between 8mm and 10mm expansion joints, visual inspection and feel the acceptance method.

Nature Flooring Del Floor Socket Decoration Switch Decoration Design Decoration Company Floor Tile Grille Light Tiling Plastic Floor Tiles

Various Shape Activated Carbon

Various Shape Activated Carbon,Spherical Activated Carbon,Bulk Activated Carbon,Coal Based Spherical Activated Carbon

NINGXIA TIANFU ACTIVATED CARBON CO.,LTD , http://www.tjfyhxt.com

This entry was posted in on