Clear Packaging Repair Procedure Flow Chart

Clearance

order

step

Construction team

jobs

owner

jobs

both sides

coordination

material

material

Adopt

purchase

Note

1 Steps: Before the construction team enters the court design
2 Budget quotation Bargaining, signing a contract Pay the first construction fee
3 Balcony, etc.
4 Apply for Gas Opening
5 Steps: Hydropower Construction delivery
6 Construction team approached to open water and electricity materials
7 Purchase of hydropower accessories See list of hydropower materials
8 Order PPR hose
9 Jointly negotiating pipeline trends
10 Chisel wall pipe slot
11 Telephone contact PPR
12 Row of wires
13 Row PPR tube
14 Electric appliances Data Specification Delivery and Construction Team See electrical list Related information and warranty card must be retained
15 Hidden project acceptance Pay the second construction fee
16 Steps: Carpentry Cabinet first measurement
17 Material procurement and mud work carried out Woodworking Woodworking Material List Woodworking materials (accessories and plates) See the list of woodworking materials
18 Order ceiling materials
19 Floor Su plate
20 Door and window cover production and furniture frame Finished door and sliding door after completion Construction team provides data
twenty one Ceiling (hall and room)
twenty two Making woodwork such as entrances and walls
twenty three Hit the ground keel
twenty four Flooring
25 Open bill of materials Procurement (Lines, Door Locks, Glass, Tracks, etc.)
26 Baseboard production
27 Door installation, etc.
28 Kitchen and bathroom ceiling It must be done after the mason is finished
29 Steps: Mason Open bill of materials
30 Procurement Accessories and Wall Tiles, Waterproof Coatings See mason list
31 Waterproof production
32 Wall tiles
33 Tiles
34 Purchase kitchen appliances
35 Second measurement of kitchen cabinets Electrical details must be provided
36 Purchasing sanitary ware and faucet
37 Step: Painter Open bill of materials See painter list After the woodwork spreads out the floor and makes furniture, it must start construction.
38 Purchase of paint materials Pay for the third project
39 Wall surface put in putty
40 Door and window cover paint
41 Grinding floor
42 Floor paint
43 Wall top latex paint
44 Steps: Plumber Open bill of materials See list of lighting fixtures Before entering the floor paint
45 purchase materials
46 Sanitary installation
47 Cabinet installation
48 Switch installation Install before the last pass of latex paint
49 Lighting installation
50 Overall acceptance Designers, Supervisors, Party A and Party B
51 Construction settlement
52 Step: Finishing work Cleaning work
53 Purchase curtains
54 Purchase furniture
55 Purchasing electrical appliances
56 Purchasing bedding and daily necessities
57 move

Welcome Qijia users to download>>> Click to enter the download form

Decoration Process Lacquer Furniture Window Furniture Latex Paint Kitchen Cabinets Glass Bricks Cabinets Doors Glass Sliding Doors Glass Furniture Kitchen Walls Kitchen Cabinets Doors Floor Tiles Glass Doors Kitchen Glass Sliding Doors Bathroom Doors Bathroom Ceiling Material Bathroom Wall Tiles Bathroom Ceilings Bathroom Design Toilets Waterproof Bathroom Floor Tiles Toilet Moves door

Pet Repeller

Pet repeller can be classified as drive pet away and keep pet in a area you want.We have many kinds of models and colors you can choose.Such as for you cat,dog and any other small pet.Keep your pet on your property and safe with this sport dog-pet safe fence.Simply bury or lay the wire to form an enclosure,then plug the transmitter into a standard outlet.Alight weight,waterproof collar receiver gives your pet one of five level of correction,with a warning tone then vibration before the correction when the boundary is reached.

Pet Repeller

Protect Pet Repeller,Electric Pet Repeller,Battery Pet Repeller,Drive Pet Repeller

SC ELITE LTD , http://www.scelite.com

This entry was posted in on