Wood door and window technology and construction process details

In the field of construction, woodworking is the most widely used, and the most common in the decoration industry, such as doors, wardrobes, cabinets, bookcases, etc. But how much do you know about the woodworking process? Here, Jiuzheng Building Materials Network will give a detailed introduction to the wood door and window process and process.

First, the construction content

Wooden doors (sliding doors and sliding doors)

Second, the construction process

1. Swing door installation procedure: determine the installation position - pop-up installation position line - place the door and window frame in place - temporary - temporary fix - use the line pendant - correct the door frame - fix the door and window - pre-Embedded wall - hang the door and window fan on the frame - Plan the hinge groove after the door size - the position should be accurate - the installation fit

2. Installation method of hanging sliding wooden door: Determine the installation position → the top of the fixed door → the side frame plate is fixed → the hanging piece is placed on the I-steel slide rail → the I-steel rail is fixed → the fixed lower rail is placed → the door is loaded Inside the special hole on the top of the head → Flatten the door with the lower rail → Fix the hanging bolt and the hanging piece → Check the door edge and the side frame plate to match → Fix the door → Install the face.

3. Installation procedure of the bottom sliding window: Determine the installation position → fix the lower frame plate → fix the side frame plate → fix the upper frame plate → pick out the wooden trough with the same thickness as the steel bar → the steel skin chute sticks in the wooden trough →The special wheel box is glued to the reserved hole at the lower end of the window sash → Install the window sash on the track → check the gap between the window side and the side frame plate → adjust → put on the face.

Third, the construction process

1. In the construction of wooden door and window cover, firstly, the hole should be punched in the base wall and the wooden mold should be laid. The spacing between the wooden molds is less than 300 mm and the spacing between each row is less than 150 mm.

2. Then cut the large core board according to the width of the design door and window and the width of the doorway, and fix it on the wall surface and the door opening with a round nail. The round nail should be nailed to the wooden mold. After checking the bottom plate is firm and safe, it can be painted with fire retardant paint.

3, the door and window cover trim panel should choose plywood with beautiful pattern and smooth surface, the tree species of plywood should meet the design requirements.

4. When cutting the veneer, firstly press the door opening and the width of the face to pop the cutting line, cut it with a Sharp knife, plan the 45° angle to the seam, paste the latex on the back and stick it on the bottom plate, and use the nail on the surface. The gun is nailed into a capless straight nail for reinforcement.

5. The joints at the door opening and the wall interface are required to be straight and 45° angled. After the veneer is pasted and installed, it is closed with a wooden corner line, and the horizontal and vertical joints of the corner line are treated with a 45° angle joint.

Fourth, the construction process of the wooden curtain box

1. Construction content

There are two forms of curtain boxes:

One is that the room has a ceiling, and the curtain box should be concealed in the ceiling and completed together when making the top ceiling.

The other is that the room is not suspended, the curtain box is fixed on the wall, and the window frame is integrated.

2, construction points

1. The specification of the curtain box is about 100 mm high, the width of the single pole is 120 mm, the width of the double pole is 150 mm or more, the shortest length should exceed 300 mm of the window width, and the sides of the window each exceed 150 mm, the longest can be with the wall. A long pass.

2, the production of the curtain box using a large core board, such as the finish is painted with clear oil, should be done with the window frame with the same material of the veneer paste, the adhesive surface is the outer side and bottom of the curtain box.

3, through-type curtain box can be directly fixed on both sides of the wall and top surface, non-through curtains should use metal brackets, in order to ensure that the curtain box installation is flat, the length of the window openings on both sides is equal, should be elastic before installation. [ Follow the WeChat public account "Jiuzhengmen Window Network"; pay attention to courtesy, scan code to send millions of business opportunities! Jiuzhengmen window network exchange group ]

As a China leading manufacturer and suppliers of TFT-LCD panels,we are specialized in many brands TFT-LCD,Touch Screen,Touch Screen Display from 2 inch to 65 inch for Industrial,Medical,Marine,Amusement,Home Automation,Avionics,Consumer application.

TFT-LCD Panel

TFT-LCD,TFT Panel,LCD Screen,TFT display,LCD panel,AUO,Innolux,Tianma,Ampire,Sharp,BOE,CPT LCD

Tonya Display Limited , https://www.tydisplay.com

This entry was posted in on