Do the waterproofing of the bathroom several times

When we renovate the bathroom, the waterproofing of the bathroom is indispensable. If the waterproofing of the bathroom is not done properly, it will cause leakage, which will have a great impact on the downstairs and your own indoor space. So good toilet water to do it a few times, what steps the bathroom waterproof construction have it, the following paper to tell you under the bar.

Do the bathroom waterproof several times

1. How many times does the bathroom waterproof work? The bathroom waterproof usually needs to be done twice. The first waterproof construction is before backfilling, and the second waterproof construction is after backfilling. Every time during waterproof construction, cement and waterproof coating are required Brush it horizontally and vertically.

2. During the first waterproof construction, you need to apply the paint evenly to the ground base. Be careful not to brush too thick, otherwise it will easily appear to be layered, and it is more difficult to dry. When we paint, if the paint has settling, it needs to be stirred in time.

3. After the bathroom is backfilled, apply a second brushing. It is necessary to brush both sides horizontally and vertically. It is best to conduct a water-proof test afterwards to ensure the quality of waterproof construction.

Toilet waterproof construction steps

1. Primary treatment

Before we carry out the waterproof construction of the bathroom, we first need to clean up the magazines and dust on the ground, and remove the cement agglomerates and loose bases, and then perform the leveling treatment.

2. Paint waterproof material

When applying water-proof paint to the bathroom, it is best to follow the principle of top-down, first brush the wall and then the ground. The first and second brushing time should not exceed 8 hours. The brushing height needs to be at least 30cm, and the height of the shower area must be more than 180cm.

3. Treatment of key waterproof parts

During the waterproof construction of the bathroom, the connection between the wall and the ground and the connection between the upper and lower pipes and the ground are all places where we are more prone to problems. We need to paint these places with emphasis, and we must not miss them.

4. Waterproof test

After the toilet waterproof construction is completed, it is best to do a waterproof test, block the toilet drain, and then fill the toilet with a certain amount of water, wait about a day to see if there will be leakage.

Summary of the article: The above is a few introductions about how to do the bathroom waterproofing several times and the steps of the bathroom waterproofing construction. I hope to give you some help in the bathroom waterproofing construction and let everyone have an excellent bathroom waterproofing quality. If you have other related needs, please pay attention to Qijia Information.

What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount

Plywood is the basic wooden product for furniture, is one of the biggest wooden products, is used for plane, boat, train, bus, construction and package etc. It is the one of the main way to save wood resource and improve the usage of wood.Usually poplar, pine, combi, hardwood as the core, the bace&back are the Veneer surface, such as Okoume, Bintangor, Pine, Birch, Poplar, Pencil cedar, Maple, Cherry, White Oak, Sapele, Beech, Red Oak, Ash etc.

LULI Group Corp. Ltd, well known as the leading manufacturer for wooden, steel and paper products, located in Shouguang, Weifang, Shandong, China. Since the foundation in 1985, it focus on the production of plywood, venner, MDF , Particle board, Door skin, Blockboard, Finger Joint Board, OSB , paper, Steel etc. And we have High Quality Plywood.

Advantages:

1.High bending strength

2.Strong nail holding

3.Moisture-proof and easy work

4.Tight construction and high strength

5.No ratten or decay

6.Low formaldehyde emission

7.The productions are suitable for the construction of viaduct and tall frame building

8.If put in boiling water for 48 hours,it still glue sticking and still formed

9.If used abide by illustration strictly,it can be reuse more than 50 times

10.Solve the problem of leaking and rough surface during construction process.Particular suiltable for watering concreat.

The details of Plywood:

size:1220*2440mm 1220*3000mm 915*1830mm 1250*2500mm, according requirement

thickness:2mm-60mm

core:poplar/combine/hardwood

glue:MR/E2/E1/E0/melamine/WBP

kinds:okoume,bintangor,pine,birch,poplar,cedar,ect.

certification:CARB,FSC,CE,JAS,ISO9001,ISO14001

plywood

Plywood

Commercial Plywood,Plywood Sheet,18mm Plywood,Plywood Prices

Luli Group Co.,Ltd. , https://www.cnluli.com

This entry was posted in on