How to do waterproof bathroom wall waterproof is also very important

Life may leak the bathroom ceiling, or downstairs neighbors to reflect that your home leaked, in addition to the broken water pipes, there is a reason that the bathroom's waterproof measures did not do a good job, then the bathroom how to do effective waterproof it? The following Xiao Bian will take everyone together to understand the bathroom's waterproof practices.

How to do a bathroom waterproof effective, do the bottom of the deal

Before the bathroom is waterproofed, it is necessary to handle the base layer to meet the requirements of waterproof construction. It is necessary to ensure that the grass-roots level is smooth, non-convex, strong, dust-free, clean, greasy, and free of wax, etc. If the base surface has voids, unevenness, cracks If there are defects, first use cement mortar for repairing and leveling, and use plastic strips to paste expansion joints. The corners of the walls should also be painted into circular arcs, and the base surface must not have clear water, but the humidity must be maintained.

How to make the bathroom effective waterproof Second, do a good waterproof base construction

When doing ground layer waterproof construction, you must first prepare a good coating according to the instructions of the waterproof coating, and then choose to use brush, roller brush and other direct adhesive coating brush on the base surface, pay attention to the uniform use of brushing strength, not Leaking brush. First paint the floor drains, water pipes, and joints at the wall joints. After it has dried, perform extensive brushing on other parts.

The paint should be applied at least twice. The thickness of the brushing should not exceed 1mm. It should be done only after the previous paint is slightly dried after brushing the second time. After almost no sticking, the brushing can be started once. Two or more vertical and horizontal directions should be used to apply the brush before and after, so that the situation of leaking brush will not occur.

How to make the bathroom effective waterproof three, do a good job of facade waterproof construction

Facade is the waterproof construction on the wall should pay attention to the location and height of the waterproof brushing, the general wall is probably painted to a height of 30cm, for the wall around the shower area to brush to a height of 180cm, or directly The entire wall is painted, and the wall of the bathtub is more waterproof than the tub 30cm. After two times of brushing dry, check the plane for cracks and bubbles.

How to make a bathroom effective waterproof four, do a good injection test

After the waterproof coating is done, it is necessary to do a closed water test, and it needs to be done twice. After the waterproof coating is dry for the first time, water is poured into the bathroom. The water depth is about 2-3cm. Remember the highest water level. Wait 48 hours. To see if the water level changes, if the change is too great, it means that the waterproof measures are not done well and need to be redone. If there is no change, then do it once again.

Editor's Note: And it's about how the bathroom is waterproof . Whether it's the floor or the wall of the bathroom, it must be waterproof. I hope the contents of Xiaobian can help everyone. If you want to learn more about the relevant information, you can pay attention to our website information.

How to do waterproof bathroom

From 2013 to 2015 year, we awarded the world`s largest P91 order from Reliance (single PO 8,000 tons P91), the final additional quantity together is up to 16,000 tons, Plus CS 11000 tons. Entire projects P grades are from Yangzhou Chengde

We can produce lots of the Alloy Steel Pipe that used on the Petrochemical and Refinery project and Gas cylinder project, such as the 4130 Steel Pipe, 4140 steel pipe,4142 steel pipe,4145 steel pipe,4147 steel pipe, P11 steel pipe ,P12 steel pipe ,P22 steel pipe ,P91 steel pipe,P92 steel pipe ,P5 steel pipe, P9 steel pipe and P36 steel pipe

Yangzhou Chengde Steel Pipe (YC) has been growing to a leading large diameter seamless pipe manufacturer with production range 8``-48`` in OD and wall thickness from 9.53 mm up to 140mm.

YC had established the post-doctoral research station since 2006 focusing on new material development such as P92, P91, X80. More than 29 kinds of new materials and products have won the national and provincial prizes from 2006 till now. 

Alloy Steel Pipe

Alloy Steel Pipe

Alloy Steel Pipe,P36 Pipe,4145 Pipe,4147 Pipe

YANGZHOU CHENGDE STEEL PIPE CO.,LTD , https://www.chengdepipe.com

This entry was posted in on