Toilet installation method tips and precautions

Everyone knows that bathroom decoration is very important. I don't know how much attention is paid to the installation of sanitary products. In fact, the installation of sanitary products will directly affect our daily life. Today, Xiaobian will share with you the tips and precautions for installing the next ten points of the toilet.

1. Before the installation of the toilet, the sewage pipeline should be inspected thoroughly to see if there are any mud and sand, waste paper and other debris in the pipeline. At the same time, check whether the floor of the toilet installation is horizontal or not. If the ground is found to be uneven, when installing the toilet. The ground should be leveled. Saw the drain so that the drain is 2mm-5mm above the ground as far as possible.

2. Before selecting the toilet, first determine the size of the water in your house. What is the distance between the water outlet and the wall? (The standard is only 300, 400 mm).

3, then choose the style you like according to the size, pay attention to choose the water-saving type (3-6 liters), order to see the model, the origin, the current product is mixed, the shop is no regrets choice.

4, before the toilet installation to determine whether you choose the product, accessories, instructions are complete, take a closer look at the manual, understand some product matters, in order to prevent the beam from changing columns, cutting corners, remember.

5. The water outlet requires the installer to handle the leveling. The bottom outlet of the toilet should be equipped with a special flange for the toilet, or evenly coated with the glass glue and the water outlet. The bottom of the toilet and the surrounding area are glued. The toilet and the wall are evenly spaced and placed. Correct and steady.

6. After the toilet seat is in place, the water is required to be leak-free, the water level is correct, the flushing is smooth, the switch is flexible, and the cover is stable.

7. The toilet seat is generally not installed with the anchor screw, but the reserved hole on the toilet should be blocked with glass glue to prevent the smell.

8. If the anchor screw is installed, first use the special sealant installed in the toilet to spread evenly on the outer 2CM of the base of the toilet base. The drain of the toilet should face the center of the drain pipe and draw a seat. The position of the expansion bolt on the left and right sides of the toilet, remove the toilet, punch, and bulge the bolt. It should be noted that this new perforated expansion bolt is embedded in the hole and may break the waterproof layer. It is recommended to pre-embed the expansion screw. At the same time, fill the seal around the hole, then bury the bolt, first screw the expansion bolt, let the expansion bolt completely release, strengthen its tension, then screw the upper screw, put the toilet, Then screw directly on the cap and keep the overall appearance. At the intersection of the toilet bowl and the outer surface of the ground surface, because the toilet bowl and the ground surface are not integrated, the joint agent + transparent sealant can be used for stirring, and the outer mouth of the toilet bowl is sealed to maintain the integrity with the ground surface. It is also possible to block the local toilet water from the outside of the toilet.

9. After the toilet is installed, wait until the glass glue (soot) or cement mortar is solidified before releasing the water. The curing time is generally 24 hours.

Prohibition: Many construction teams use cement as a binder in order to save trouble. This is definitely not enough. It fills the fixed position of the bottom of the toilet. In fact, there is a drawback in the middle. The cement itself has expansion and long time. This method may lead to cracking of the base of the toilet and is not convenient for maintenance.

10. Install or commission the water tank fittings. First check the water pipe, drain the pipe for 3-5 minutes to ensure the cleaning of the water pipe; then install the angle valve and the connecting hose, then connect the hose to the installed water tank fitting inlet valve and press the water source to check the water inlet. Check whether the valve water inlet and sealing are normal, check whether the installation position of the drain valve is flexible, whether there is any jam or leakage, and check whether there is any leaking inlet valve filter device.

Other precautions for toilet installation:

The installation width of the reserved toilet is preferably not less than 0.75 meters. Many domestic toilets on the market today have good quality and look. Can fully take into account the current small size of the domestic bathroom area, the volume is not large. On the other hand, imported toilets are generally "body-wide and fat". If you don't like special preferences, please think twice. Because the width of the toilet installation can be more than 0.75 meters, it is convenient to use.

The toilet should not be used in an environment below zero degrees Celsius, otherwise the water will expand and burst into the ceramic body. Do not hit the ceramic with a hard object to prevent damage and water leakage. In order to keep the surface of the product clean, use nylon brush and special cleaning agent. It is strictly forbidden to use steel brush and strong organic solution to avoid damaging the product and eroding the pipeline.

The water seal height at the bottom of the toilet is too low, which may cause the bathroom to return to taste and affect health. If it is too high, the water surface will splash easily, so the manufacturer should adjust the water seal to the proper position according to the height of the individual's needs.

If the toilet is bought back, the decoration team will raise a piece, make a water guide, and then do waterproof; or buy a drain converter accessory to connect. However, any change in abnormal installation will destroy the vacuum suction of the toilet, affecting the original sewage discharge speed and the odor-blocking effect. If the toilet and drain hole you bought are really not right, it is best to ask the dealer to change it.

If you need to do another toilet drainage, or to move the existing toilet to the position, you must raise the ground so that the horizontal pipe has a slope, which makes the dirt easier to wash away. But try not to move the position of the toilet, otherwise it will easily cause blockage.

H135 A type CPE performance
Mainly used as the impact resistant modifier of PVC. At present, it takes 95% share of the impact resistant modifier market of domestic PVC. The additive shares of H135 A type CPE as the impact resistant modifier of PVC profile shapes is 9~ 12; the shares as the impact resistant modifier of PVC water feeding pipe and other liquid transfer pipe under pressure is 4~ 6; this can effectively improve the low temperature resistant impact property of PVC product. In addition, H135A type CPE is widely added into the products including PVC plate, sheet, calcium-plastic box, case of household appliances and electrical appliance fittings to improve the mechanical property and electrical property.
H135 A type CPE can be compatible and use with most plastics and rubbers simultaneously. The polymer cross blend system with bad compatibility can take CPE as bulk filler. The rubbers used together with CPE include caoutchouc, butadiene styrene rubber, ethylene propylene diene copolymer, polyurethane rubber, acrylonitrile butadiene rubber, neoprene and chlorosulfonated polyethylene etc. The plastics used together with CPE include PVC, PE, PP, EVA and PA etc, which greatly improve the low temperature resistant impact property and increase flame resistance, oil and aging resistance, corrosion resistance and insulatibity. This can make the plastic product have high filling property and reduce production cost.

Packing and Storage :

PP bags with PE film inside, Net Weight of 25 ± 0.2kg per bag ; as the viscoelastic and water absorption of CPE resin are strong, this product shall be stored in the dry and ventilated warehouse with stack height no more than 10 bags and avoid solarization, damp and takes strict precautions again stress. It is not dangerous cargo.

CPE

Polyethylene Film,Chlorinated Polyethylene,Polyethylene Resins,CPE Plastic Sheet

Shandong Gaoxin Chemical Co.,Ltd , http://www.gaoxinchem.com

This entry was posted in on