What to do after getting a house

>>>>Links: Friends of the pro statement about the loss of experience remind you to decorate more than a few eyes

Decoration is a very troublesome thing, for most people do not know how to start, some people do not even know a little basic knowledge. I now write these, is to let everyone have a concept, not to the rush of.
First of all, you must have your own house. Then, do you want to have an idea? Is it all inclusive? Clearing? Or half a package?
If you have a reliable decoration company, or you have a lot of meters in your pocket, or the most simple decoration, and you do not want to worry about, all inclusive, it is also half a package is generally large buy their own, dressing decoration company to buy, here There was a problem. I noticed that many decorating companies used fake and inferior materials to construct. At that time, of course, they couldn't be seen. However, problems may occur in a year or two. For example, poor cement, easy-to-drop tiles, and bad putty, Wall paint is easy to fall off, etc. Is it easy to clear the bag? Ye Hao is also troublesome and is not afraid of the material being fake, because it is to spend time and energy to choose, but, do you have so much time and energy? Not the average Energetic, and the workers are also very likely to find you in trouble, this material is not good for a while, there are problems in a moment, you follow it, best, have a little understanding, or two people to do the work together, if a People are really tired.
Now don't talk about all-inclusive (in that case, you don't have much to do.) First of all, you have to determine how much money you need to spend on your house, including labor costs, management fees, taxes, and materials. Don't forget where to avoid the artificial, where do not management fees, budget, you have to play a little bigger, so that you have sufficient funds to be able to dominate, the general algorithm for labor costs, the simple is 100 yuan a square, if the factory installation, Then it can be removed. The management fee is generally 50 yuan a square, which is a bit expensive, but some large companies are the price, so the budget is calculated first. Then it is to see if you have a few bathrooms, whether solid wood The floor. Simple budget, artificial, material, all add up, a square about 600, this is the basic decoration (although basic decoration, but all the equipment inside is also complete it), more than 800 square is a mid-range decoration , 1000 or more that is high-end, when it comes to high-end, then there is no end of it.


After these set down, then we must arrange these funds rationally, just like cakes, according to the proportion, for example, solid wood flooring accounts for about 20% of the total budget for renovation, artificial 10%, 2% paint, 7% of bricks, electrical appliances 5%, etc. In this way, all the funds are arranged. Then when you purchase any materials, you will know what price material is your choice, so that if it is renovated, it will exceed your budget. In mastering, and, if there is a part of you that you must overrun, then you can save a bit in other projects. Personally think that the first thing you should pay attention to is the budget control. If you have this ability, I think, other people can do it. If you have chosen correctly.
The following thing is to find a decorating company. Since you have your design ideas and ideas, then you can discuss with the decorating company, say your ideas, and get ready, what is the decorating company at this time? Suggestions and advice, you can also take home, ask someone to discuss it, combine your own ideas with the decorating company's suggestions, as your own plan, talk with another company, and this way, your design will come The more mature, constantly looking for, constantly updating, and then summing up to find a company you are satisfied with.
Although you have found a good decorating company, you haven’t started yet, but your task has to continue. Then you need to look at the material in the market. According to your design ideas, choose the style and color. In the selection, make a record, generally A main election, two alternatives, styles and colors not similar, so that you can change with the renovation program, you can adapt.
Well, you just wait for the key to start.


Postscript ---- decoration contract, filing, etc. Please note that the various terms and supplements, a lot of traps.
Identifying a contract is an effective guarantee for home improvement. The contract includes a work schedule and a construction manual. It is imperative that the memorandum items be listed one by one, and the sub-item be discussed with the contractor, and the construction level and scope of work Explain clearly, do not be ambiguous, so that ex post contractors have excuses to increase costs or shirk responsibility.
These construction instructions, work schedules, and budget sheets should preferably have three drafts, one for the contractor, one for his own retention, and one for the other, so as not to lose the ground.
The construction instructions should be accompanied by the name of the space, the decoration project, and then clearly indicate the brand, number, color, size, and even the degree of painting or painting of the material or sample, so that if the workers do not follow the schedule or delay the progress Only on the basis of requirements can the contractor redo or improve.

The method and time of payment must also be clearly stated in the contract. The warranty period is at least 3 months. There is no construction quality accident before the final payment (about 20% of the full price) is paid. However, regardless of the payment method used, it must be remembered that the last amount must be completed in all the work, fully meet the requirements, and be completed within the warranty period before it is fully paid.

Get the key, go with the designer to see it, put your ideas and ideas, once again communicate with the designer, after measuring the house, you can see the drawings in about two days, this is a simple design, just put some walls Cabinets, background walls, wall modifications, cabinet locations, electrical sockets, etc. have a written explanation. After confirmation, construction begins. If any objections are raised, please submit it as soon as possible. Any further thoughts during construction may delay the construction period and may result in waste. Oh, money. The design renderings include (a) Detailed design instructions should be included in the provided design drawings.
(b) Flat elevation
1, the original room map
2. Wall renovation
3, Plane furniture layout
4, the ground map
5, smallpox diagram
6, on-site production of furniture elevation map (based on the actual situation or not)
7, the door elevation map (out or under the actual situation)
8. Partial elevation of kitchen and bathroom (except custom-made kitchen)
9. TV facade wall elevation
10. Elevation diagrams of other walls requiring construction of the wall (c) Sectional drawing
1, should indicate the material, material, color, etc.
2, door and window cover profile
3, entrance profile
4, smallpox profile
5, TV background wall profile
6, other parts to be profiled
7, hydropower construction plans

The contract generally includes the following contents: the names of the contracting parties, decoration costs, payment methods (phased or one-time), construction period (set working days, not the completion date), as well as the obligations of both parties. The current renovation contract has been changed to version 06. Attachments include: quotations for separate items, numbered drawings and material samples. The contract is attached to the annexes, which are generally in duplicate and are kept by both parties. If the decoration company does not give the user a copy, the user should take the initiative to request. The decoration company entering the market has to sign three contracts and give it to the market management department. Some users are accustomed to the old-fashioned decoration (doing speaking and speaking), thinking that the provisions of the above approach are too restrictive, in fact, this approach protects the user. If there is no change, the renovation company will not add extra money.


At the same time, you can book electric wires, wires, cement, yellow sand, distribution boxes, water Pipes, and other hydropower equipment, including if you need to seal doors and windows, you can also do it later. For hydropower construction, refer to my other materials. Hydroelectric construction for about one week is the work of ceramic tiles and cabinets. Under normal circumstances, the cabinet should be measured twice, once for the embryonic walls, because for gas meters, the layout needs to be roughly determined, and the cabinets should also have drawings. The second measurement is to make an accurate measurement after the tile is finished. This work relates to the accuracy of the cabinet installation. After the toilet tile is laid, it is the toilet and the bathtub installation. This item can be carried out slowly because the ceramic tile needs to be finished. After about 3 days of dry and stable period, we can only walk and work normally. In the construction of non-slip floor tiles, due to the glue component in the cement, we must clean it on one side to prevent the cement mixture from being removed.
Tile paving should draw a reference line from the floor above the specifications of the bricks, and then put on the Internet, and then paste the tiles below the baseline. Try to avoid the tiles in the direct contact with the line of sight, so it is generally at the door and Lay cutting bricks in the back position. If the workers have a good workmanship, or if you require a higher level, then the bricks can be cut and stitched at a 45 degree angle for the position of the sun corners. The laying height is usually about 2.4 meters, and the ceiling should be placed on the tiles. , conducive to aesthetics. The height of the kitchen tiles is about 2.2 meters, some people want to save the tiles behind the cabinet, but may be because cement easily absorb moisture and affect the use of cabinets later, so you can use the price of the bottom tile paving, can not do any prevention. The floating window sill should also be constructed at this time.
Note that tiles, marble, etc., should be covered after construction to avoid scratching the surface.
For toilets and tiles, please refer to my other posts. After the cement work is over, the woodwork enters the market. The purchase of materials should be prepared and purchased in the previous process. Woodwork enters the field, then wooden doors, wood, etc. It can be delivered home, and at the same time, if you are preparing solid wood floors, the keel can also be played because at this time the keel is laid and during the laying of the floor, the keel can be naturally dry, equal to the humidity of the air, and it is also the future of the floor. The stability has certain advantages. If it is laid with reinforced composite or solid wood composite, then the blockboard on the ground cannot be fixed to the ground after cutting, preventing the moisture added by other constructions from affecting the stability of the blockboard, and can be staked on the ground. No fixed treatment. After the wooden door is purchased, it can be opened to prevent ventilation. Due to poor quality, the wooden door may be deformed. After installation, there will be sound and affect the use. If any deformation can be found early, the wooden door should be installed after the wall construction to avoid other construction. Process damage wooden doors. During the woodwork construction process, quality inspections should be performed continuously, such as door frame lines. If there is cracking, it should be noted that it may not be visible after painting, but after a period of time The natural drying of time may cause cracking.
The woodworking phase includes the following steps: door frames, ceilings, window covers, and vertices, etc. Paints are used. It should be noted that some of the volatile gases produced by the paint will cause yellowing on the latex paint on the walls, so try to avoid them. Open paint and latex paint work. Before the paint work comes up, it is necessary to do a thorough inspection and acceptance work so that some problems cannot be discovered after painting.
The paint is over, then the floor, and you're done.
In any construction, we must pay attention to the acceptance of all kinds of work. If there are more than a dozen categories, if there are more than 10 categories, then there are 5, 60 small categories. Many observations, and more communication with the construction party, found that the problem immediately suspended the construction, to discuss, renovation is after all a major event, if a lot of work if rework, the cost of labor costs materials, so we need to be careful.

Decoration Process Paint Decorate Design Decorating Cement Window Decoration Project Budget Table Decoration Ceiling Effect Picture Decoration TV Wall Effect Drawing Decoration Decoration Company Decoration Decoration Effect Picture Decoration Cost Budget Wall Cabinet Decoration Effect Picture Home Decoration Effect Picture House Decoration Effect Picture Entrance Decoration Effect Cabinet Doors Marble Tiles Marble Cabinets Closet Doors Kitchen Cabinet Doors Floor Tiles Wall Cabinets Bathroom Tiles Bathroom Doors Bathroom Tiles Color Bathroom Doors Dimensions Bathroom Dimensions Bathroom Design Drawings Bathroom Ceilings Material Bathrooms Ceilings Bathrooms Design Drawings Bathroom Designs Bathroom Tiles Home Layout Tiles Glue Tile Wall Background Tile Tile Tile Specification Premium Tile Tile Price Kitchen Tile

Flange,Elbow & Fastener

We just share our stock in warehouse, we could list a rich portfolio which may help you get replacement parts easily.

Flanges are used to connect valves, pipes, pumps and other equipment to make a pipework system. Typically flanges are welded or threaded, and two flanges are connected together by bolting them with gaskets to provide a seal that provides easy access to the piping system

Stainless Steel Flange,Forged Steel Flange,Valve Flange,Pipeline Flange

Zhejiang Philic Fluid Control Co.,LTD , https://www.philicflow.com

This entry was posted in on